St. Johnsbury Revitalization Grant Fund Program

Rachel Waterhouse • June 15, 2023

Applications are being accepted now under the transformational projects category.

The application period is now open for the St Johnsbury Revitalization Fund Grant Program (STJRFGP). The purpose of this grant program, administered by the Town of St. Johnsbury, is to encourage investment that stimulates the local economy, provides a pathway for growth and resiliency, and that results in a more sustainable, inclusive, and vibrant community. 

 

Program Features

Grants are provided to business owners/operators, start-ups, and non-profit organizations for projects that meet community need in the areas of business support, growth of the creative economy, housing, access to outdoor recreation, and access to mental health and social services. Grants are available at three levels:

  • STJRFGP Micro-grants: Grants of $1,000 - $5,000 aimed to address small-scale projects. 50% of grant funds will be allocated upon award, with 50% reserved until project completion. A 10% match is required (cash or in-kind). TOTAL FUNDS AVAILABLE THIS ROUND: $50,000
  • STJRFGP Planning & Implementation: Reimbursement grants of $5,000 - $40,000 to support a wide array of project implementation and feasibility (see examples of projects in attachment 1). A 20% match is required (cash or in-kind). TOTAL FUNDS AVAILABLE THIS ROUND: $100,000
  • STJRFGP Transformational Project Grants- Applications are available June 13, 2023 with a July 17, 2023 submittal deadline. If there are remaining funds application will be accepted and reviewed on a rolling basis. Maximum grant available is $200,000 and there is no match requirement for transformational grant projects.


Round 1 of Micro-grants and Planning & Implementation grants were due on May 30, 2023. Applications are currently being reviewed with awards anticipated to be announced by July 15. A second round of grant funding is anticipated to be made available in 2024.

 

Contact Town Manager Chad Whitehead at cwhitehead@stjvt.com or 802-748-3926 x 2

 

Follow the links below for Application Forms, Frequently Asked Questions and Program Process Information:

STJRFGP-fillable application for Transformational Project

STJRFGP- fillable application-micro-planning and implementation

STJRFGP Frequently Asked Questions

STJRFGP Process

W-9

August 25, 2026
Any questions regarding your tax bill please call the Town Clerk's Office at 802-748-4331.
August 25, 2026
August 25th 8 am until 2 pm
August 12, 2026
August 2026
August 7, 2026
Early Notice and Public Review of a Proposed Activity in a Floodplain Town of St. Johnsbury, Vermont To: All interested Agencies, Groups, and Individuals The Northern Border Regional Commission (NBRC) intends to fund the following Proposed Action under the Catalyst Program. NBRC will prepare an 8-Step Decision-Making Process review in compliance with Executive Order (EO) 11988 (Floodplain Management), to ensure federally funded projects consider floodplain impacts and avoid unnecessary risks, as well as to avoid direct or indirect support of new construction in floodplains where there is a practicable alternative. Proposed Action: The purpose of the Proposed Action is to address the lack of a dedicated bicycle/pedestrian connection between the Lamoille Valley Rail Trail (LVRT) and St. Johnsbury’s Designated Downtown. The Proposed Action would enhance safety and accessibility for trail users by connecting the LVRT to the Three Rivers Path and St. Johnsbury’s downtown riverfront area to enhance recreational opportunities and promote the economic revitalization of St. Johnsbury. Specifically, the Proposed Action includes the construction of an approximately 2,600-foot-long multi-use path extension along the western side of Bay Street. Lighting would be installed along this length as well as the portion of the previously constructed path to the existing trailhead. The proposed path extension would begin at the Main Street LVRT Trailhead at 493 Main Street in St. Johnsbury, Vermont, at the approximate geographic coordinates of 44.4097081, -72.0181651. After crossing Main Street to Bay Street, the proposed path would continue along Bay Street to extend to the southern terminus of the existing Three Rivers Path just south of the Green Mountain Power (GMP) Bay Street Substation at 311 Bay Street. It has been determined by a review of Flood Insurance Rate Map (FIRM) Panel Number 5000310015B that portions of the Proposed Action would be located within a 100-year floodplain (Zone A7), warranting analysis under the 8-Step Decision-Making Process. Most of the land between the existing Three Rivers Path and the LVRT trailhead at Main Street lies within the 100-year floodplain of the Passumpsic River. The calculated fill volume for all new material being placed below the base flood elevation is approximately 978 cubic yards. The Proposed Action is subject to local review and approval per the Town of St. Johnsbury Flood Hazard Regulation, which includes review by the Rivers Program of the Vermont Department of Environmental Conservation. This notice provides people who may be affected by the Proposed Action and those who have an interest in the protection of the natural environment with an opportunity to express their concerns and provide information. Commenters are encouraged to offer alternative sites, alternative methods to serve the same project purpose, and methods to minimize and mitigate impacts.  Comments should be submitted by email to nepa@nbrc.gov . NBRC is accepting comments on this notice for 15 days from August 8, 2026 , through the end of the day of August 23, 2026 . Date of Publication: August 7, 2026
August 3, 2026
August 4th, 2026 from 7 am until 4 pm
July 28, 2026
Cliff Street from Winter to Church Street
July 24, 2026
Wednesday July 29th, 2026
July 14, 2026
Warning and Sample Ballots
July 14, 2026
Concord Ave Closed
July 2, 2026
Thursday, July 2nd, 2026